Construction for this house was completed in September, 1993.  Along the way it’s had a number of improvements, or renovations. The following is a list of the most noteworthy:
– Vinyl windows installed in 2006.
– Bonus room renovated in 2006.
– Interior custom wood shutters installed on most windows in 2008.
– Kitchen renovated in 2008; granite counter-tops, new gas cook-top, vinyl tile floor, refinished cabinetry.
– HVAC replaced and upgraded in 2009; two Trane units, upstairs/downstairs, programmable thermostats.
– Roof replaced in 2010, 30-yr. architectural shingles; new gutters and aluminum trim added.
– Gutter covers over most of the gutters added.
– Water heater replaced in 2015.
– Master bath renovated in fall 2018, to include new tile floor, refinished cabinets, new light fixtures (Double shower was installed in master bath within first 5 years).